CONSTRUCTION OF DELIMARA LNG TERMINAL - MALTA

The location of the project was the Delimara Power Station in Malta. The main scope of the project consisted on the driving of ninety nine (99) steel tubular piles with OD 1016 – 1400 mm, length from 22,00m – 54,00 m, for the construction of liquefied natural gas (LNG) import and re-gasification facility based on a floating LNG storage vessel.

The project’s duration was 90 days.