COMPLETION OF SIRTE COMMERCIAL PORT - LIBYA

The location of the project was the Port of Sirte in Libya. The main scope of the project consisted on the seabed dredging on a volume of 30.000 m3, the underwater embankment construction on a volume of 550.000 m³, the underwater construction of crushed stone layer on 7.000 m² surface, and the placement of 1900 concrete blocks with a nominal weight from 45 to 65 tons.

The project’s duration was 12 months.