CONTAINER TERMINAL EXTENSION / RIJEKA – CROATIA

The location of the project was the port of Rijeka in Croatia. The main scope of the project consisted on the seabed dredging on a volume of 60.000 m³, the removal of old artificial concrete blocks, the underwater embankment construction on a volume of 550.000 m³, the underwater construction of crushed stone layer on 7.000 m² surface, the interconnection of the old/current quay with the new by laying special type concrete elements and in-situ casting.

The project’s duration was 14 months.